Monthly Archives: March 2017

E Company 330th IR HQ Positions During Normandy Campaign July 1944

I recently had a very nice note from someone whose father was in E Co 330 IR during July and August, 1944.  So I thought, I don’t necessarily have to go from A to M, 329 to 331.  So here is E Co. 330 IR, July, 1944.

I had an pleasantly different problem here with E Co. 330 IR. Whoever was doing the Morning Reports took full and ample advantage of the Record of Events.  I had trouble making it all fit without cluttering up the map.  Not sure I succeeded, but you have to appreciate the recorder’s willingness to take the time to do good Records of Events.

I only have doubts about a couple of entries.  14 July says they “marched 2 miles toward the front-line”, but then the night’s position is neither 2 miles away nor necessarily toward the front, at least not what we might think of as the front with our vision of the operation.  But doesn’t mean they didn’t move toward the fighting.  Later with all the companies mapped out, maybe it will make more sense.

Then for 19 July, the report says “moved back one (1) mile”, and while it really was an actual good mile, it wasn’t “back” by our perspective, but forward; which might explain why they were disappointed to be receiving more artillery fire instead of less.

By the way, anyone can feel free to point out typos, misspellings, etc. Such thing’s never have been a strong point.

E Co, 330 IR HQ positions during the Normandy campaign; Normandy, France; July 1945

E Co, 330 IR HQ positions during the Normandy campaign; Normandy, France; July 1944

Position of 1 Bn, 330 IR from 28 July to 31 July, 1944, around le Lorey

I had someone interested in seeing just when, what units of the 83 ID were where, around le Lorey. This seemed like an interesting way to look at things.  Once I had it done though, I thought that a day by day visualization would be less busy, easier to follow; but then I thought again, what was wanted, was to see where everything was around a certain point and what I had worked well for that. An operations view could be done later, once I have all the companies mapped out individually.

We are dealing with the 1 Bn, 330 IR here, on the days 28-31 July, around le Lorey. This is the ending of the Normandy campaign for these guys and they are being blessed with rest, hot food and recuperation.

I had trouble only with D Co coordinates for 28 July. The report used the same coordinates as the days before, up to the north-west of Remilly-Sur-Lozon; but it specifically said in the location field for 28 July, that they were “2 mi S Remilly-Sur-Lozon”; and in the Action Report for the 28th it is stated they advanced a good 5 miles; and in the Action Report for the 29th, it is said they remained “in defensive position”, no mention of any movement. So, I have assumed the recorder made the mistake of putting the position at beginning-of-day instead of at end-of-day for the 28th and have placed the 28th where the 29th was reported. I think that’s a pretty good guess. 

Position of 1 BN, 330 IR, around le Lorey, France from 28-31 July, 1044

Position of 1 BN, 330 IR, around le Lorey, France from 28-31 July, 1044

A Company, 229th IR HQ Positions During Normandy Campaign

I finally got another company campaign map done.  I decided to go back to A Co, 329 IR and should follow along in order.  A Co, unfortunately doesn’t have much in the way of action reports, but we do get a good picture of their positions and moments. I have serious doubts about days 17 and 18 because the given coordinates puts A Co on the other side of highway 3, as it was called then, which I thought was in the 4 ID area by those dates.  But if the coordinates given were wrong, the author was insistent; using the coordinate for each day twice in the report. So I quite trying to figure out what might have happened and placed the points as given.

A Co, 320 IR HQ positions during the Normandy campaign; Normandy, France; July 1945

A Co, 320 IR HQ positions during the Normandy campaign; Normandy, France; July 1945